# Fixed task inputs for C2 Task A (written with the plan, before running) HEADING: Field Report 7F3A P1: The north survey team logged eleven soil samples before noon on Tuesday. P2: Pump station four was offline for ninety minutes because of a tripped breaker. P3: All readings were uploaded to the shared archive by six in the evening. TABLE (3 rows x 4 cols): Site | Samples | Depth cm | Status Alder | 4 | 35 | done Birch | 7 | 50 | pending CALC: A1=17 A2=25 A3=58 A4==SUM(A1:A3) -> ground truth 100 AUDIO (Task B): tone440.wav 1.000 s 440 Hz, tone880.wav 2.000 s 880 Hz, 44100 Hz mono 16-bit, amplitude 0.5; expected export 3.000 s, 440 Hz then 880 Hz.